AI-Driven BOQ & Work Schedule Engine
Instantly extract material quantities from drawings, automate cost analysis, and generate dynamic work schedules with forensic precision.
Forensic Intelligence Console
AGENT ONLINE
Agent investigating drawing parameters and contract schedules...
>>> System Initialization OK.
>>> CrownateStudio Neural Extractor loaded.
>>> Chat with the node below, or upload project files (PDF, Excel, CAD, Images, Text).
Forensic BOQ Queries:
Marketplace & Pricing Intelligence:
Upload Drawings, BOQs, Specs, Contracts, Cost Reports or Images
Supports PDF, Excel, DWG, DXF, Word, Images, Text
ATTACHED PROJECT ARTIFACTS (0)
AI Construction Intelligence Hub
Real-time analytical output from drawing layers, trade categories, material specifications, and risk indexes.
Project Overview
- Project Name: Apex Residential Tower C
- Document Count: 1 Analyzed
- Analysis Status: Active✓
- Key Findings:
- MEP alignment conflicts detected in sector grid C4; pricing variations found in imported cladding material schedules.
Quantity Intelligence
- Total Extracted Qty: 4,988 units
- Primary Trade: Earthworks & Foundation
- Material Summary: 6.5k bags cement, 15T structural rebar.
Cost Intelligence
- Estimated Savings: ₦1,250,000 (Optimize Rebar)
- Cost Variance Target: +4.2% threshold
- Variation Impact: ₦1,300,000 net offset.
BOQ Section Breakdown & Pricing Audit
Detected BOQ Sections:
- • Preliminaries & Mobilization (Trade ID: PRE-01)
- • Excavation and Earthworks (Trade ID: ESC-02)
- • Concrete Works & Reinforcement (Trade ID: CON-03)
- • Cladding & Finishing works (Trade ID: CLA-04)
Pricing Anomaly Alerts:
- • Imported Cladding rate of ₦480.00/m2 falls below typical regional index (Average: ₦1,200.00/m2).
- • Cement supply quantities perfectly calibrated to volumetric concrete parameters.
Geometric Clash & MEP Alignment Engine
| Clash ID | Element A | Element B | Sector Grid | Severity | Resolution Action |
|---|---|---|---|---|---|
| CL-109 | Column C4 Grid | HVAC Ducts (12" Ø) | Level 2 Grid C4 | Critical | Shift HVAC centerline 150mm East to clear concrete web. |
| CL-110 | Foundation Footing F2 | MEP Water Main Loop | Foundations Block B | Medium | Reroute main entry sleeve through shear wall sleeve S3. |
Material Specifications & Compliance Registry
Required Technical Standards:
- • Concrete Strength: Minimum grade C30/37 with fly-ash additive.
- • Structural Steel: BS 4449 Grade 500B high-tensile reinforcement.
- • Cement Quality: NIS ISO 9001:2015 certified 42.5R Grade.
Compliance & Gaps:
- • GAP: No fire protection coating specification found for structural steel columns.
- • Vetted: All cement properties match Obajana/BUA manufacturing standards.
Project Forensic Risk Matrix
Cost Risk
Critical
Imported cladding rates unhedged against currency volatility.
Evidence: Row 1.3 Underprice
Action: Source local alternative or request fixed pricing contract.
Design Clash
Medium
MEP ducts conflict with structural framing on Grid Line C4.
Evidence: DWG Layer MEP-S02
Action: Coordinate displacement offsets before fabrication.
Procurement
Low
Heavy steel rebars from African Foundries require transport permits.
Evidence: Material Schedule Item 3
Action: File permits with District 4 traffic beacon.
Project Context: Apex Residential Tower C
ID: PRJ-993-8X
Location: District 4
Client: Horizon Corp
Live Performance Grid
Total Project Cost
$0.00
Total Rows
124
Verified Output
98
Cost Variance
+4.2%
Work & Material Schedule Matrix
| Ref | Structural Description | Unit | Qty | Rate | Amount | Node State |
|---|---|---|---|---|---|---|
| 1.1 | $0.00 | Verified | ||||
| 1.2 | $0.00 | Verified | ||||
| 1.3 | $0.00 | Pending |
Nigerian Material Database
-
Dangote 3X Portland Cement
Size: 50kg Bag | Supplier: Obajana | Qty: 4,000Vetted -
BUA Cement
Size: 50kg Bag | Supplier: BUA Group | Qty: 2,500Vetted -
High Tensile Ribbed Rebar
Size: 16mm & 20mm (12m) | Supplier: African FoundriesUnlinked
Equipment & Labor Allocation
-
Tower Crane (10T) - 45 Days$4,500
-
Skilled Labor Force - 1,200 Hrs$36,000
Variation Orders
| ID | Description | Impact | Date | Del |
|---|---|---|---|---|
| VO-101 | Added Earthworks Depth | +2400.00 | Oct 12 | |
| VO-102 | Reduced Rebar Specs | -1100.00 | Oct 15 |
Financial Analysis
Subtotal Computation$0.00
Overheads Risk Set (15%)$0.00
System Profit Margin (10%)$0.00
Grand Total$0.00