CrownateStudio AI BOQ Hero

AI-Driven BOQ & Work Schedule Engine

Instantly extract material quantities from drawings, automate cost analysis, and generate dynamic work schedules with forensic precision.

Forensic Intelligence Console

AGENT ONLINE
Agent investigating drawing parameters and contract schedules...

>>> System Initialization OK.

>>> CrownateStudio Neural Extractor loaded.

>>> Chat with the node below, or upload project files (PDF, Excel, CAD, Images, Text).

Forensic BOQ Queries:
Marketplace & Pricing Intelligence:
Upload Drawings, BOQs, Specs, Contracts, Cost Reports or Images

Supports PDF, Excel, DWG, DXF, Word, Images, Text

ATTACHED PROJECT ARTIFACTS (0)

AI Construction Intelligence Hub

Real-time analytical output from drawing layers, trade categories, material specifications, and risk indexes.

Project Overview
  • Project Name: Apex Residential Tower C
  • Document Count: 1 Analyzed
  • Analysis Status: Active✓
  • Key Findings:
  • MEP alignment conflicts detected in sector grid C4; pricing variations found in imported cladding material schedules.
Quantity Intelligence
  • Total Extracted Qty: 4,988 units
  • Primary Trade: Earthworks & Foundation
  • Material Summary: 6.5k bags cement, 15T structural rebar.
Cost Intelligence
  • Estimated Savings: ₦1,250,000 (Optimize Rebar)
  • Cost Variance Target: +4.2% threshold
  • Variation Impact: ₦1,300,000 net offset.
BOQ Section Breakdown & Pricing Audit
Detected BOQ Sections:
  • • Preliminaries & Mobilization (Trade ID: PRE-01)
  • • Excavation and Earthworks (Trade ID: ESC-02)
  • • Concrete Works & Reinforcement (Trade ID: CON-03)
  • • Cladding & Finishing works (Trade ID: CLA-04)
Pricing Anomaly Alerts:
  • • Imported Cladding rate of ₦480.00/m2 falls below typical regional index (Average: ₦1,200.00/m2).
  • • Cement supply quantities perfectly calibrated to volumetric concrete parameters.
Geometric Clash & MEP Alignment Engine
Clash ID Element A Element B Sector Grid Severity Resolution Action
CL-109 Column C4 Grid HVAC Ducts (12" Ø) Level 2 Grid C4 Critical Shift HVAC centerline 150mm East to clear concrete web.
CL-110 Foundation Footing F2 MEP Water Main Loop Foundations Block B Medium Reroute main entry sleeve through shear wall sleeve S3.
Material Specifications & Compliance Registry
Required Technical Standards:
  • • Concrete Strength: Minimum grade C30/37 with fly-ash additive.
  • • Structural Steel: BS 4449 Grade 500B high-tensile reinforcement.
  • • Cement Quality: NIS ISO 9001:2015 certified 42.5R Grade.
Compliance & Gaps:
  • • GAP: No fire protection coating specification found for structural steel columns.
  • • Vetted: All cement properties match Obajana/BUA manufacturing standards.
Project Forensic Risk Matrix
Cost Risk Critical

Imported cladding rates unhedged against currency volatility.

Evidence: Row 1.3 Underprice
Action: Source local alternative or request fixed pricing contract.
Design Clash Medium

MEP ducts conflict with structural framing on Grid Line C4.

Evidence: DWG Layer MEP-S02
Action: Coordinate displacement offsets before fabrication.
Procurement Low

Heavy steel rebars from African Foundries require transport permits.

Evidence: Material Schedule Item 3
Action: File permits with District 4 traffic beacon.

Project Context: Apex Residential Tower C

ID: PRJ-993-8X Location: District 4 Client: Horizon Corp

Live Performance Grid

Total Project Cost
$0.00
Total Rows
124
Verified Output
98
Cost Variance
+4.2%

Work & Material Schedule Matrix

Ref Structural Description Unit Qty Rate Amount Node State
1.1 $0.00 Verified
1.2 $0.00 Verified
1.3 $0.00 Pending
Nigerian Material Database
  • Dangote 3X Portland Cement
    Size: 50kg Bag | Supplier: Obajana | Qty: 4,000
    Vetted
  • BUA Cement
    Size: 50kg Bag | Supplier: BUA Group | Qty: 2,500
    Vetted
  • High Tensile Ribbed Rebar
    Size: 16mm & 20mm (12m) | Supplier: African Foundries
    Unlinked
Equipment & Labor Allocation
  • Tower Crane (10T) - 45 Days
    $4,500
  • Skilled Labor Force - 1,200 Hrs
    $36,000
Variation Orders
ID Description Impact Date Del
VO-101 Added Earthworks Depth +2400.00 Oct 12
VO-102 Reduced Rebar Specs -1100.00 Oct 15

Financial Analysis

Subtotal Computation$0.00
Overheads Risk Set (15%)$0.00
System Profit Margin (10%)$0.00

Grand Total$0.00