AI-Driven BOQ & Work Schedule Engine

Instantly extract material quantities from drawings, automate cost analysis, and generate dynamic work schedules with forensic precision.

Forensic Intelligence Console

>>> System Initialization OK.

>>> CrownateStudio Neural Extractor loaded.

>>> Chat with the node below, or upload a drawing layer.

Upload Architectural/Engineering Drawing (.dwg, .pdf) for AI Analysis

Project Context: Apex Residential Tower C

ID: PRJ-993-8X Location: District 4 Client: Horizon Corp

Live Performance Grid

Total Project Cost
$0.00
Total Rows
124
Verified Output
98
Cost Variance
+4.2%

Work & Material Schedule Matrix

Ref Structural Description Unit Qty Rate Amount Node State
1.1 $0.00 Verified
1.2 $0.00 Verified
1.3 $0.00 Pending
Nigerian Material Database
  • Dangote 3X Portland Cement
    Size: 50kg Bag | Supplier: Obajana | Qty: 4,000
    Vetted
  • BUA Cement
    Size: 50kg Bag | Supplier: BUA Group | Qty: 2,500
    Vetted
  • High Tensile Ribbed Rebar
    Size: 16mm & 20mm (12m) | Supplier: African Foundries
    Unlinked
Equipment & Labor Allocation
  • Tower Crane (10T) - 45 Days
    $4,500
  • Skilled Labor Force - 1,200 Hrs
    $36,000
Variation Orders
ID Description Impact Date Del
VO-101 Added Earthworks Depth +2400.00 Oct 12
VO-102 Reduced Rebar Specs -1100.00 Oct 15

Financial Analysis

Subtotal Computation$0.00
Overheads Risk Set (15%)$0.00
System Profit Margin (10%)$0.00

Grand Total$0.00